When wiring a gauge into a location other than a car dashboard for example in a caravan park and dash lights may not be available. The diagram below.
The Redarc Smart Start Vsr Battery Isolator And How It Works
Redarc sbi12d wiring diagram. Redarc electronics have a large database of faqs tech tips wiring diagrams and how to guides. This terminal will attach to your auxiliary battery positive terminal. The recommend switch is a 10 amp momentary switch adrian with a momentary switch you can forget to turn it off. Standard wiring diagrams 3 loads load circuit fuse breaker auxiliary battery start battery fuse sbi 3 3 5 4 6 7 1. Wiring instructions 3 connect a battery positive cable cable 1 to one of the battery terminals as shown in diagrams b c d. It is used as a solenoid priority system in dual battery systems and provides 12v dc incorporating 100a of continuous ratings.
This switch does not connect to the cranking battery positive it is switching earth so one side to earth and the other side to the black wire on the sbi12d. The below diagram shows how to install a gauge using switches to simulate ignition and dash lights providing a simple way to switch the gauge onoff both withwithout the backlight active. The sbi12d has the added feature of allowing charge both ways. The switch wiring to override the sbi12 needs to be 4mm auto cable. Check them out today. The first 100 orders over 50 receive a free stubby holder and sticker pack from built not bought.
6 mount the sbi unit in a convenient location as shown in diagram k. Redarc recommend using midi fuses along with a quality fuse holder to match. The redarc smart start sbi12 is a microprocessor controlled battery isolator which protects the start battery from excessive discharge while allowing the auxiliary battery to supply charge to non essential loads.