Once the bulbs are installed you are free from the maintenance for another 45000h of use. The fixture is then rewired using the provided wiring diagram before the installation of any led tubes.
Toggled T8 Amp T12 Led Light Tube Installation Instructions How To Install Led T8 Amp T12 Linear Lamps
Hyperikon led wiring diagram. Yeah also many wiring representations are offered this circuitry representation can steal the visitor heart a lot. Only problem is this is more difficult than retrofitting the tube alone and as is the case with other electrical installations requires the fixtures power to be disconnected at source. Fully weatherproof ip65 waterproof rating ensures that your led flood lamp wont give in to the elements. Secure safety cable to connection hole as needed. 3 disconnect cut wires to ballast leaving enough wire to be tied off with wire nuts 4 tie off remaining wires attached to ballast with wire nuts. Insert luminaire into the t bar ceiling grid.
Precious viewers when you are searching the brand new hyperikon wiring diagram electrical wiring diagram collection to read this day hyperikon wiring diagram can be your referred electrical wiring diagram. 5 see wiring diagram shown below for fixture rewiring instructions. Choose hyperikons bright reliable professional high output led lighting for commercial and residential spaces including home exterior home interior garage shop large indoor areas and large outdoor areas. Save energy by switching to led and choosing hyperikons 50w waterproof outdoor led flood light you can save up to 80. A simple way to make sure you have a single ended tube is to look for the ln sticker at the end of the tube or ac inputsingle end tubes only use one side of the tube both live and neutral power will be on the same end of the tube but different pins. Hyperikons 18w led tube is suitable for different kinds of applications operates at a fraction of the wattage of fluorescent tubes while also performing up to 45000 hours.
6 install led retrofit tubes into fixture. 7 re connect power supply and turn on switch. Unscrew and remove the driver cover. Lift up the mounting clips on the sides of the fixture. You can do it by hand or by using pliers. Magnetic and bylass installation created date.
For fluorescent replacement led tube lights and any other led solution rely on hyperikon. Carefully remove the knockout for the ac input. First things first you need to be 100 sure you have single ended tubes and non shunted tombstones.