M2cp wiring diagram symbols installation and maintenance manual september 2018 e2k 402 0817 rev. Figure 1 below is generic and provided primarily for wiring.
Eim Wiring Diagram Connect Fresh Air Damper To Blower Unit
Eim m2cp wiring diagram. Refer to wiring diagram and eim job spec sheet for components provided by eim. Installation and wiring refer to the wiring diagram supplied with the actuator for wiring details and options supplied with the system. Eim m2cp actuator manuals. Select the highest 12 npt vent location in the gear box remove 12 npt plug and replace with pn 83385. The control module uses eims m2cp tbm01 termination panel for interface of all analog control types. M2cp 113 model 1 author.
Eim modular modular control package m2cp is available configured in many combinations of electrical and electronic parts. Our experienced engineering and application staff is constantly developing unique and advanced safety valve solutions. The digital futronic module. Placement on actuator can be determined only after field location and position of valve has been determined. Manufacturer of high quality and high performance safety relief valve products. Possible locations of the plugs are shown on eim outline drawing.
Connect control wires to tbm and power motor voltage to pwr terminals. 3 figure 25 reversing contactor showing open and close coils mechanical interlock and electrical interlock contacts o 21 22 c 21 22 figure 26 nuisance trip to prevent tso contact tripping when valve has been jammed. Eim modular control package mcp is. Eim aquanaught variant of the m2cp actuators can withstand extended submersion. Rely on m2cp actuators even in operating environments with severe vibration. Eim furnishes a pressure relief vent fitting pn 83385.
C at an electric power generation plant. Refer to wiring diagram and eim jobm2cpkbg bevel gear actuator in high temperature steam service 1f. M2cp 2000 actuator iom. Page 22 section 6.